{"id":3042,"date":"2018-04-12T00:00:00","date_gmt":"2018-04-11T22:00:00","guid":{"rendered":"https:\/\/2021.battery-power.eu\/pressemeldung-in-power-transformer-news-11-4-2018\/"},"modified":"2018-04-12T00:00:00","modified_gmt":"2018-04-11T22:00:00","slug":"pressemeldung-in-power-transformer-news-11-4-2018","status":"publish","type":"post","link":"https:\/\/2024.battery-power.eu\/en\/pressemeldung-in-power-transformer-news-11-4-2018\/","title":{"rendered":"Pressemeldung in Power Transformer News, 11.4.2018"},"content":{"rendered":"<h3>Power Transformer News berichtet am 11.4.2018 \u00fcber die internationale Konferenz &#8220;Batterietagung 2018&#8221;:<\/h3>\n<p><strong>The global market for battery energy storage systems (BESS) is set to grow by a rate of approximately 19 per cent per year until 2025, a recent study finds, which was published on Tuesday alongside Batterietagung 2018 conference in M\u00fcnster, Germany.<\/strong><\/p>\n<p>The annual BESS market volume is expected to grow to 24,5 GWh until 2025, starting from 6 GWh in 2017, according to the CEO of market research firm Avicenne Energy, Christophe Pillot.<\/p>\n<p>The overall market for Lithium-Ion Batteries is set to reach a volume of 490 GWh by 2025.<\/p>\n<p>A research paper from Forschungszentrum J\u00fclich, also presented during Batterietagung 2018, says that in Germany currently are 55 BESS projects with a system size of more than 1 MW in operation. Their cumulated storage capacity sums up to approximately 500 MWh. The main application field is the provision of primary control Power (PCP).<\/p>\n<p><strong>Zur Originalmeldung hier klicken.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power Transformer News berichtet am 11.4.2018 \u00fcber die internationale Konferenz &#8220;Batterietagung 2018&#8221;: The global market for battery energy storage systems (BESS) is set to grow by a rate of approximately 19 per cent per year until 2025, a recent study finds, which was published on Tuesday alongside Batterietagung 2018 conference in M\u00fcnster, Germany. The annual [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[93],"tags":[],"class_list":["post-3042","post","type-post","status-publish","format-standard","hentry","category-alle-pressemitteilungen-2018"],"acf":[],"_links":{"self":[{"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/posts\/3042","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/comments?post=3042"}],"version-history":[{"count":0,"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/posts\/3042\/revisions"}],"wp:attachment":[{"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/media?parent=3042"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/categories?post=3042"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/2024.battery-power.eu\/en\/wp-json\/wp\/v2\/tags?post=3042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}